Interagency Q&A · Force Placement 6

Once a lender makes a determination that a designated loan has no or insufficient flood insurance coverage and sends the borrower a force placement notice, may a lender make a subsequent determination in connection with the initial notification period that the designated loan has no or insufficient coverage and send another force placement notice, effectively providing more than 45 days for the borrower to obtain sufficient coverage?

The agencies’ answer

No. The Act and Regulation state that once a lender makes a determination that a designated loan has no or insufficient flood insurance coverage, the lender must notify the borrower and, if the borrower fails to obtain sufficient flood insurance coverage within 45 days after that notice, the lender must purchase coverage on the borrower's behalf.150 For example, if in response to a force placement notice, the borrower obtains flood insurance that is insufficient in amount, there is no extension of the time period by which the lender must force place flood insurance.

Footnotes

  1. 12 CFR 22.7(a) (OCC); 12 CFR 208.25(g)(1) (Board); 12 CFR 339.7(a) (FDIC); 12 CFR 614.4945(a) (FCA); and 12 CFR 760.7(a) (NCUA).

Source

Text retrieved October 29, 2026.