When is flood insurance required on a construction loan?

  • For construction lending, flood and compliance teams at banks and credit unions
  • Rules checked against the eCFR on November 7, 2026

In short: A loan secured by a building to be built in a special flood hazard area is a designated loan from the start, so the lender makes the flood determination and gives the notice before origination. It can require the policy at origination or defer it with controls, but coverage must be in place before it disburses funds for building construction. A loan secured only by land isn’t a designated loan.

On this page 8 sections

A building that doesn’t exist yet still counts. A loan secured by a building to be built in a special flood hazard area is a designated loan from the start, but the rules let a lender time the policy around the slab, the Elevation Certificate and the first construction draw. This guide covers the two ways to comply, the 30-day waiting period, and escrow.

The key points

  1. Land alone isn’t a designated loan. A loan secured only by land in an SFHA, even land to be developed into lots, isn’t secured by a building (Q&A Construction 1).
  2. A building to be built is. Make the flood determination and give the notice of special flood hazards before origination (Q&A Construction 2).
  3. Either insure at origination, or defer with controls. If you defer, coverage must be in place before you disburse funds for building construction, and the NFIP’s 30-day waiting period applies (Q&A Construction 4 and Q&A Construction 5).
  4. Escrow starts when the policy is bought, for residential loans without an exception. A construction-permanent loan generally doesn’t qualify for the 12-month exception (Q&A Construction 6; Q&A Escrow Loan Exceptions 4).

“Q&A” references are to the regulators’ 2022 Interagency Questions and Answers Regarding Flood Insurance. Rule citations are to the OCC’s Part 22; the Federal Reserve, FDIC, NCUA and Farm Credit Administration rules say the same.

When is a construction loan a designated loan?

A designated loan is one secured by a building or mobile home “located or to be located” in an SFHA where NFIP insurance is available, and a building includes “a walled and roofed structure while in the course of construction, alteration, or repair” (12 CFR 22.2(c) and (e)). So:

  • Make the determination before origination, for the building to be constructed, and if it will be in an SFHA, give the borrower the notice of special flood hazards before origination too (Q&A Construction 2).
  • The purchase requirement applies: you can’t make, increase, extend or renew the loan unless the property is covered by adequate flood insurance for the term of the loan, using one of the two approaches below (Q&A Construction 4).

The two ways to comply

  1. Require the policy at origination

    The NFIP lets a borrower buy a policy at loan origination, rated on the construction designs and intended use of the building. A provisional rating, if the criteria are met, allows coverage before the Elevation Certificate; the NFIP expects the certificate and a full-risk rating within 60 days of the policy’s effective date, and failing to get it can reduce coverage at the time of a loss (Q&A Construction 4).

  2. Defer the purchase, with controls

    You may let the borrower wait until the foundation slab is poured or an Elevation Certificate is issued, or, if the lowest floor will be below the Base Flood Elevation, until the building is walled and roofed. Either way, coverage must be in place before you disburse funds for building construction, other than for the slab or preliminary site work such as utilities, clearing, or buying and delivering materials. Have controls that get the policy bought at least 30 days before that disbursement (Q&A Construction 4).

The 30-day waiting period. New NFIP coverage generally takes effect 30 days after the application and premium payment. The exception for loans: when the purchase is in connection with making, increasing, extending or renewing the loan, coverage takes effect at closing if the application is made and the premium presented at or before closing (44 CFR 61.11(b) and (d)). If you defer the purchase until after the loan closes, the waiting period applies, which is why the controls above count back 30 days from the construction draw (Q&A Construction 5).

What does the NFIP cover during construction?

  • Before it’s walled and roofed, a building under construction is insured only while work is in progress, or for up to 90 continuous days after work stops (General Property Form III.A.6; Q&A Construction 3).
  • Below the Base Flood Elevation, coverage doesn’t apply until the building is walled and roofed if the lowest floor is below the Base Flood Elevation in Zones A1–A30, AE, AH, AR and their AR combinations, or below the Base Flood Elevation adjusted for wave action in Zones VE and V1–V30, measured as the policy describes (General Property Form III.A.6.b).
  • Materials and supplies are covered only while stored in a fully enclosed building on or next to the site (General Property Form III.A.5; Q&A Construction 3).
  • When coverage starts in practice: a policy bought before construction isn’t effective until construction actually starts, such as pouring a slab or footing or installing piles, or until materials are stored in a fully enclosed building at the location or on an adjacent property (Q&A Construction 3; General Property Form III.A.5).

When does escrow start?

For a residential designated loan, if you defer the purchase, begin escrowing the premiums and fees when the policy is bought, unless an escrow exception applies (Q&A Construction 6). A construction-permanent loan, typically a construction phase that converts to a 20- or 30-year loan, generally doesn’t qualify for the exception for loans of 12 months or less, even if the construction phase is that short (Q&A Escrow Loan Exceptions 4). Loans primarily for a business, commercial or agricultural purpose are excepted from escrow. See our escrow guide.

Questions lenders ask

Does a loan secured only by land need flood insurance?

No. Land, even land to be developed into lots, isn’t a building, so the loan isn’t a designated loan (Q&A Construction 1). It becomes one once a building secures it.

Can a lender let the borrower wait to buy flood insurance on a construction loan?

Yes, with controls. Coverage must be in place before you disburse funds for building construction, other than for the slab or preliminary site work such as utilities, clearing, or buying and delivering materials (Q&A Construction 4).

Does the NFIP 30-day waiting period apply to a deferred construction policy?

Yes. It’s waived only when the borrower applies for the policy on or before the loan closes (Q&A Construction 5).

Can a building under construction be insured?

Yes. The NFIP insures a building in the course of construction before it’s walled and roofed, rated on its designs and intended use, unless construction stops for more than 90 days or the lowest floor for rating is below the Base Flood Elevation (Q&A Construction 3).

Sources

Rule text from the eCFR, current as of November 5, 2026, when we checked it on November 7, 2026.

How FloodCaliber™ handles this

FloodCaliber™ runs inside your environment and works the flood review from your loan files, for your reviewers to approve.

  • Reads the loan files. Loan approvals, appraisals, flood determinations and policies, with each value linked to its page.
  • Runs again when the loan changes. The calculation reruns at every make, increase, renew or extend, with the record of what changed.
  • A record examiners can follow. A second reviewer approves, and the workbook and report keep each building, its source and every change.

Our team works with your lending, flood and compliance staff as a partner in flood compliance.

FloodCaliber™ supports your compliance program but does not guarantee compliance.